



A short survey we did on first year students in Kolej Antarabangsa Ibu Zain. Out of 217 students, 82 took the survey and the result for "What do you know about Polystyrene" as follow. Overall not many students know what is polystyrene in general.
The Zero Polystyrene Survey Questionnaires:1) Is the environment important for you?
Universiti Kebangsaan Malaysia (UKM) Campus was developed in 1970 consists of 13 faculties, 14 institutes and 10 research centres.
Solid waste generation rate in UKM is approximately 8 tons per day with total population approximately 30,000 persons including academic and supporting staff and students. Approximately 2,700 tons of waste produced in a year.
MISSION OF ZERO WASTE CAMPUS
To carry out research, management and planning of sustainable resources on solid waste management towards a sustainable ecosystem by taking into considerations aspects of an integrated solid waste management, efficient usage of resources and conservation of the ecosystem.
OBJECTIVES OF ZERO WASTE CAMPUS
SOLID WASTE MANAGEMENT IN UKM
Previously, several different contractors were involved in waste collection, depending on location. Since 2009, contractor for waste management is Alam Flora Sdn. Bhd.
Resources utilized to collect waste:
· 1 compactor truck with 8 tons capacity
· 3 tri-cycles
· 1 dedicated supervisor
General collection schedule of solid waste:
a) Organic wastes:
- Cafeterias: once a day including Sundays
- Other locations: 3 times weekly
b) Recyclable items:
- Cafeterias: On-call basic
- Other locations: 3 times weekly
c) Bulky wastes: On-call basis
d) Yard wastes/green wastes: Handled by another landscape contractor, dumped behind Faculty of Education for natural decomposition and composting.
IMPLEMENTATION STRATEGY
1. Waste Treatment Technology
2. Solid Waste Characterisation
3. Education, Awareness, Governance
WASTE COMPOSITION AT UKM 2009
Highest percentage of organic waste, followed by paper and plastics
Downloads:
MOVING TOWARDS ZERO WASTE CAMPUS